Proper Pixel

Recent Projects

March 2023
MD Department of Agriculture EV

MD Department of Agriculture EV

Providing preventive maintenance on two BGE SmartEV DC Fast charging stations at the Maryland Department of Agriculture headquarters in Annapolis.  On this day we arrived in the rain.  Undeterred, we set up our EZ-Up tent, dried off the equipment and went through the...
BGE-BWI Rideshare Lot

BGE-BWI Rideshare Lot

Four stations at the BWI Rideshare Lot receive regular preventive maintenance from our experienced technicians since we initially installed them. This DC Fast Charger was installed through BGE’s EVSmart program and delivers 480V, enabling drivers to top up their...
Ikea Nottingham

Ikea Nottingham

Troubleshooting a level 2 ChargePoint charger in the Ikea parking lot across from White Marsh Mall in Nottingham.  We have worked as Chargepoint partners and certified installers and repair technicians for years.  After determining that this charger was experiencing...
DC DOT EV charger

DC DOT EV charger

We installed these DC fast chargers for the Washington DC Department of Transportation.  As trusted and certified technicians, Tritium enlists us to perform routine diagnostics and maintenance on these chargers to insure maximum up-time.  These 50kw chargers boast the...