Proper Pixel

Recent Projects

District Court LED

District Court LED

The District Court building on Baltimore’s East Side sports some new computer controlled LED lighting.  Originally the location of a Sears store with enormous 3 story glass windows, after closing in 1981 the building was converted into the District Court.  The...
Arbutus Public Library EV

Arbutus Public Library EV

Public charging is vital to the success of the transition to more electric vehicles on the road.  As part of BGE’s EVSmart program, this Level2 charger at the Arbutus library is on the list of projects we regularly maintenance to make sure when you need a...
MD Department of Agriculture EV

MD Department of Agriculture EV

Providing preventive maintenance on two BGE SmartEV DC Fast charging stations at the Maryland Department of Agriculture headquarters in Annapolis.  On this day we arrived in the rain.  Undeterred, we set up our EZ-Up tent, dried off the equipment and went through the...
BGE-BWI Rideshare Lot

BGE-BWI Rideshare Lot

Four stations at the BWI Rideshare Lot receive regular preventive maintenance from our experienced technicians since we initially installed them. This DC Fast Charger was installed through BGE’s EVSmart program and delivers 480V, enabling drivers to top up their...